1/3rd scale Dozer track progress- Todays picture shows the next step for the right side of the tracks . I now have the pads bent, drilled and knotched and yesterday i welded the grousers on . I also cut the spacer tubes in the box that go between the links. Today I am going to try to cut out the first 26 link pieces, get them duplicated and drilled and hopefully get them assembled and attached to the pads.
Have a great Tues.