November 22, 2024

P&H 5700 XPA Cable Excavator early framing progress being done by Northern Michigan Metal fabricator Don Campbell.

Welding – Todays very early progress picture shows very little progress yet as many things have to be factored in and designed on paper at this point . But you can see in this picture the lower frame section now partially welded together out of 2″ square tubing . I called the steel store today but the other 50 feet did not come in yet.
Tomorrow I will move to the front and cut out a few parts for the bucket.